Manager- VES CDMM COE
Chennai, Chennai-MRV, IN
Responsibilities & Key Deliverables
Key Responsibilities
- Define and own EOL test strategy, specifications, and system architecture.
- Develop and validate automated functional, electrical, diagnostic, and communication tests.
- Translate product specifications into comprehensive test coverage matrices and validation plans.
- Integrate PLCs, DAQ modules, fixtures, relays, load cards, and HIL systems into EOL setups.
- Collaborate with machine builders on fixture design, ergonomics, safety, and automation-readiness.
- Ensure compliance with IATF 16949, ISO 26262, ASPICE, and internal manufacturing standards.
- Drive MES and traceability integration, ensuring VIN-wise data logging and analytics.
- Lead commissioning, FAT/SAT validation, industrialization, and ramp-up readiness activities.
- Troubleshoot complex electrical and electronic issues to support production uptime.
- Mentor EOL engineers/technicians and coordinate with VES, ME, Quality, and Supplier partners.
Experience
8 years in automotive EOL testing (including ≥5 years ICT/FCT/EOL machine development and ≥3 years on EV HV systems).
Industry Preferred
Automotive
Qualifications
Education & Experience
BE/BTech/ME in Electrical/Electronics/Automotive/Mechatronics. 8 years in automotive EOL testing (including ≥5 years ICT/FCT/EOL machine development and ≥3 years on EV HV systems).
KPIs & Targets
- First Pass Yield (FPY) for mature stations.
- Test Cycle Time & Throughput adherence.
- Coverage Metrics: ICT , Flying‑probe , MDA, FCT - Coverage to 100%
- Defect Escape Rate near zero.
- Station OEE & Downtime linked to EOL.
- EOL Stability Index (R&R ≤10%, CpK ≥1.33).
- MES Traceability Compliance 100% VIN/serial genealogy.
- Timely readiness of test stations for new programs.
General Requirements
Required Skills & Tooling
- Automotive E/E systems: ECUs, sensors/actuators, diagnostics, HV safety practices.
- Communications: CAN/CAN‑FD, LIN, FlexRay, Automotive Ethernet, DoIP; UDS/ISO 14229.
- Software & Test Platforms: NI LabVIEW/TestStand, Python, PLC programming, Vector CANoe/CANalyzer.
- ICT/FCT equipment: Bed‑of‑nails and flying‑probe ICT, FCT rigs, coverage metrics.
- Manufacturing data systems: MES/SCADA/SQL, OPC‑UA/MQTT integration, traceability schemas.
- Quality methods: PFMEA, Control Plan, GR&R/MSA, Cp/CpK, FAT/SAT readiness.
- Fixtures & safety: Pogo‑pin/contact wear, ESD controls, HiPot/IR setups, guarding/interlocks.
Deliverables
- EOL Specification Pack (test scope, limits, methods, safety, data retention).
- Coverage Matrix & Validation Plan (ICT/FCT/Boundary‑scan/HIL).
- Station BOM & Fixture DFM/DfT.
- FAT/SAT Protocols & Reports; GR&R/MSA reports.
- MES Integration Artefacts (data models, dashboards/SPC).
- Ops Playbook (SOPs, troubleshooting trees, preventive maintenance).
Compliance & Standards
IATF 16949, ISO 26262, ASPICE; station safety per ISO 13849/IEC 62061; PLC per IEC 61131‑3; HV safety per ISO 6469; ESD/IPC standards as relevant.
Job Segment:
Electrical, Engineering, Automotive